Discover GW Campus Development Community Notices Contact GW - Day or Night
Neighborhood Home

Overview

Historic Preservation Plan

Streetscape Plan

Community Outreach

Shared Benefits

Compliance

Overview

Regulatory Filings

Current Projects

Square 39/School of Public Health & Health Services

Square 55/Science & Engineering Hall

Square 75

Square 77

Square 102/GW Museum & The Textile Museum

Square 103/Phase I - Law Learning Center Garage

Gelman Library Renovation

Ross Hall Renovation

Virginia Science and Technology Campus

Completed Projects

Overview

Project Updates

Overview

Programmatic Partnership

Development Partnership

Project Updates

Contact Us

Site 102B on Square 102/ The George Washington University Museum & The Textile Museum

Centrally located on the Foggy Bottom Campus, The George Washington University Museum and The Textile Museum will foster the study and appreciation of art, history, and culture, both within the university and throughout the global community. Through its affiliations and its own collections, including the 18,000 works of the Textile Museum and the unparalleled Albert H. Small Washingtoniana Collection, the new museum will link audiences, scholars, and collections with other museums, cultural and academic organizations.

GW Museum - 21st Street Perspective, North

Scheduled to open in 2014, The George Washington University Museum and The Textile Museum will be located at 21st Street between G and H Streets on the southwest corner of University Yard. Identified as development site 102B under the 2007 Foggy Bottom Campus Plan, this site is designated for a maximum 90% lot coverage, with a maximum height of 65’ (the adjacent Corcoran Hall is 65’ while Woodhull House is 36’ high). The new museum will include a new structure and a renovation of the historic Woodhull House.  The new building’s footprint is anticipated to be approximately 7,000 SF with two below grade and four stories above grade with a total combined gross floor area of approximately 26,000 SF (26,271 allowable).  The museum will house gallery and exhibition spaces including a high bay gallery and will provide learning and educational facilities. In addition there will be library facilities, staff offices, and collections processing.

Construction began in fall 2013 with substantial completion anticipated in late 2013 and the museum opening in 2014.

RELATED DOCUMENTS

FACT SHEET
Construction Updates

Daily Construction Images of the George Washington University Museum and Textile Museum

View From 21st Street
View From University Yard


Square 102 in the News:

'Have You Yet Decided on a Plan for the Capitol?'

Albert H. Small Donates Historic Letter to University

George Washington University Museum Groundbreaking Ceremony

Textile Museum Symposium Draws Hundreds of Scholars to GW

George Washington University Museum Approved by Zoning Commission

George Washington University Museum Gets Preliminary Zoning Approval

George Washington University Hosts Textile Museum Symposium

The Textile Museum Joins the George Washington University

A Historic Gift

GW Museum images from
April 5, 2012 filing -
click on thumbnail for high resolution images


21st Street Perspective
East



21st Street Perspective
North


G Street Perspective


21st Street Perspective
Southeast


G Street Elevation


21st Street Elevation


University Yard Elevation

Model View 1

Model View 2


Model View 3


Model View 4


Model View 5


Model View 6


Model View 7


Model View 8

June 25, 2012 - Zoning Commission Order of Approval for Square 102/ "The George Washington University Museum and The Textile Museum"
The June 25, 2012 Order of Approval (06-11F/06-12F) was published in the DC Register on July 27, 2012 and is available online

April 19, 2012- Filing to Zoning Commission of Post-Hearing Submission for Square 102/ "The George Washington University Museum and The Textile Museum"

April 5, 2012 - Presentation to the DC Zoning Commission at Square 102 Public Hearing

March 15, 2012 – Supplemental Pre-hearing Submission to the District of Columbia Zoning Commission for Review and Approval of a Second-Stage Planned Unit Development; Modification of a First-Stage Planned Unit Development; and Further Processing Approval of an Approved Campus Plan

January 20, 2012 - Pre-hearing Submission to the District of Columbia Zoning Commission for Review and Approval of a Second-Stage Planned Unit Development; Modification of a First-Stage Planned Unit Development; and Further Processing Approval of an Approved Campus Plan

November 2, 2011 – Application to the District of Columbia Zoning Commission for Review and Approval of a Second Stage Planned Unit Development; Modification of a First Stage Planned Unit Development; and Further Processing Approval of an Approved Campus Plan

October 11, 2011 – Notice of Intent to File a Zoning Application

 